The challenge

Government institutions need backup that survives long stretches without a maintenance visit, because the visit is the part that does not reliably happen.

Our solution

A comprehensive backup solution for critical government school loads.

Scope of supply

  • Hybrid inverter: 20 kW
  • Battery rating: 69 kWh
  • Backup duration: 4.5 hours
  • Load capacity: 15 kWh

Application

Critical infrastructure with low maintenance requirements — suited to government institutions

What changed

The school holds a 15 kWh load for four and a half hours on 69 kWh of storage, and the solar array cuts what it spends on power on the days there is no outage.

The result worth measuring here is in years rather than hours. There is nothing to top up, nothing to corrode, and no routine for anyone to keep — which is what decides whether a government installation is still working in year five or quietly failed in year two while continuing to look installed.

Questions we are asked about this

Enough to carry the loads that matter during a cut — lighting, fans, connectivity, any laboratory or computer equipment — for the length of a typical outage. This installation pairs a 20 kW hybrid inverter with 69 kWh of storage for a 15 kWh load over four and a half hours.

No routine maintenance. LFP is sealed: no electrolyte to top up, no terminals to clean, and the BMS handles protection against overcharge, deep discharge and temperature without anyone present. That is the reason it suits institutions with no technical staff.

Yes. This installation was delivered under UP NEDA, and CLN Energy has also supplied BSNL, Indian Railways and RailTel Corporation.

Yes, and that is the difference between a backup system and a hybrid one. A backup-only installation earns nothing on the days nothing goes wrong; paired with solar, the same equipment reduces consumption from the grid every day.

On site